Detail Drawing, Design and process flow diagram for CETP (Combined Effluent Treatment Plant) having capacity of 10 MLD CETP or more with detail case study
Designing and constructing a CETP involves several stages, including site selection, process design, detailed engineering, and construction.
Here is a brief overview of the process flow diagram and design considerations for a CETP with a capacity of 10 MLD or more.
Design and Drawing:
- 1. Site Selection and Survey: The first step in designing a CETP is to select a suitable location that is easily accessible and has sufficient space for the treatment plant. The site should also be close to the industries that will be sending their effluent to the CETP. A survey of the site should be carried out to determine the topography, soil conditions, and groundwater levels.
- 2. Process Design: The next step is to develop a process design for the CETP based on the quality and quantity of the effluent, as well as the discharge standards set by the regulatory authorities. The process design should include the treatment units, such as screens, equalization tanks, chemical treatment units, primary and secondary clarifiers, aeration tanks, tertiary treatment units, and sludge treatment units.
- 3. Hydraulic Design: The hydraulic design of the CETP involves determining the flow rate, hydraulic loading rate, and detention time of each treatment unit. The hydraulic design should ensure that each treatment unit operates within its design capacity and can handle peak flow rates.
- 4. Structural Design: The structural design of the CETP involves designing the tanks, pipelines, pumps, and other equipment to withstand the loads and stresses they will be subjected to during operation.
- 5. Electrical and Instrumentation Design: The electrical and instrumentation design of the CETP involves designing the power distribution system, control systems, and instrumentation to monitor and control the various treatment units.
CETP Plant Process Flow Diagram:
- 1. Effluent Collection: The first step in the process flow diagram is the collection of effluent from various industries and transporting it to the CETP through pipelines.
- 2. Screening: The effluent is then screened to remove large debris and solid particles that could damage the equipment downstream.
- 3. Equalization Tank: The effluent is then transferred to an equalization tank, where it is held and homogenized to ensure a uniform flow rate and composition.
- 4. Chemical Treatment: Coagulants and flocculants are added to the effluent to destabilize and settle out suspended solids, fats, oils, and greases.
- 5. Primary Clarifier: The effluent is then sent to a primary clarifier where the suspended solids settle down and are removed as sludge.
- 6. Biological Treatment: The effluent is then sent to an aeration tank where bacteria are added, and oxygen is supplied to promote the breakdown of organic matter.
- 7. Secondary Clarifier: The effluent is then transferred to a secondary clarifier where the remaining suspended solids settle down and are removed as sludge.
- 8. Tertiary Treatment: The effluent is further treated to remove remaining contaminants such as nutrients and pathogens, through processes such as sand filtration, activated carbon filtration, or UV disinfection.
- 9. Sludge Treatment: The sludge removed from the primary and secondary clarifiers is treated through anaerobic digestion, dewatering, and drying, to produce biosolids that can be safely disposed of or used as fertilizer.
- 10. Effluent Discharge: The purified effluent is then discharged into a water body or reused for non-potable purposes such as irrigation or industrial processes.
Detailed Case Study of Common Effleunt Treatment Plant(CETP):
One example of a CETP project is the Effluent Treatment Plant (ETP) for the Ankleshwar Industrial Estate in Gujarat, India, with a capacity of 30 MLD. The project involved the designing, drawing, and construction of a CETP to treat the effluent from multiple industries in the estate.
The CETP comprised various treatment processes, including screening, equalization, aeration, and biological treatment using activated sludge. The plant also included tertiary treatment using chemical coagulation, followed by sand filtration and activated carbon filtration.
The treated effluent was discharged into the river, meeting the Central Pollution Control Board (CPCB) guidelines for effluent discharge. The CETP also included online monitoring systems to ensure compliance with environmental regulations.
The Ankleshwar CETP project is an excellent example of a successful CETP project that effectively treated effluent from multiple industries and ensured compliance with environmental regulations.
In conclusion, designing and constructing a CETP with a capacity of 10 MLD or more requires specialized knowledge and technical expertise. The designing and drawing of a CETP involve various steps, including site selection, hydraulic and process design, and equipment selection. The process flow diagram of a CETP typically includes primary treatment, secondary treatment, and tertiary treatment processes. A successful Common Effleunt Treatment Plant project requires effective planning, management, and monitoring to ensure compliance with environmental regulations and the efficient treatment of effluent from multiple industries.
To get in touch with us and to relish the benefits of our services, call us at +91-9650608473 or send an email to enquiry@netsolwater.com.