How to design an STP plant for 500 people in manufacturing industries?
The Central Pollution Control Board (CPCB) regulations must be followed when designing a sewage treatment plant (STP) for an Indian manufacturing industry that employs 500 people. This is necessary for environmental compliance and sustainability. We will detail the procedures and factors involved in designing such a facility in this extensive guide.
Step 1: Understanding CPCB Norms:
Understanding the CPCB standards and guidelines is crucial before beginning the design process. These laws specify the maximum allowable concentrations of a number of characteristics in treated sewage, including Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), and Biochemical Oxygen Demand (BOD). Consult the most recent CPCB recommendations to guarantee compliance as these standards are subject to change.
Step 2: Estimating Sewage Generation:
Based on the number of employees and their average water usage, you must calculate the daily sewage generation in order to construct an efficient STP. Make the following calculations for a sector with 500 employees:
· Average Water Consumption per employee (as per CPCB guidelines): Around 135-150 liters per day.
· Daily Sewage Generation = Number of Employees × Average Water Consumption per Employee.
Daily Sewage Generation = 500 employees × 150 liters/employee/day = 75,000 liters/day.
Step 3: Treatment Process Selection:
Selecting the best sewage treatment method is essential. The choice is made based on the effluent quality standards, budget, and available space. Common methods for treating industrial effluent include:
BOD and TSS are successfully eliminated using the biological treatment method known as the "activated sludge process" (ASP). It's suitable for industrial wastewater that's high in organics.
SBRs, or Sequential Batch Reactors, are adaptable and can manage varying wastewater loads. They effectively remove nutrients and can meet CPCB standards.
Chemical Coagulation-Flocculation: Chemical treatment may be necessary in some circumstances to get rid of particular contaminants or to improve the efficiency of biological treatment procedures.
Membrane Bioreactors (MBRs): MBRs produce high-quality effluent by combining biological treatment with membrane filtration. They are appropriate for industries that have strict requirements for effluent purity.
Step 4: Preliminary Design Parameters:
An Activated Sludge Process (ASP) is frequentlyutilised in manufacturing sectors with 500 personnel. Here are some initial design specifications:
Daily sewage generation: 75,000 liters/day.
BOD Load: Varies by industry type (per CPCB standards). To find out the precise BOD limitations for your sector, visit CPCB rules.
Hydraulic Retention Time (HRT): The HRT is determined by the treatment method that is chosen and the standards for acceptable effluent quality.
Sludge Production: The properties of the wastewater and the effectiveness of the treatment process determine how much sludge is formed during the process.
Step 5: Detailed Design of the Activated Sludge Process (ASP):
The following elements are commonly included in the activated sludge process:
Aeration Tank: This is where the biological treatment occurs. Hydraulic retention time (HRT) and average daily flow rate are used to calculate the tank capacity. The HRT should complement the chosen therapeutic objectives.
Handling Sludge: The sludge generated throughout the process needs to be controlled. It may be dewatered and disposed of in accordance with local laws.
Disinfection: To assure pathogen elimination, the treated effluent must undergo a disinfection procedure after the clarifier. Chlorination or ultraviolet (UV) disinfection are frequent techniques.
Clarifier: Wastewater needs to settle after being treated in the aeration tank to get rid of suspended solids. The clarifier needs to have the right size to allow for effective solids settling. Key design factors include the clarifier's surface area and the settling velocity of solids.
Step 6: Compliance with CPCB Norms and Effluent Quality:
You must routinely check and maintain the system to guarantee compliance with CPCB standards. The effluent from the ASP ought to be in compliance with established limitations for criteria like BOD, COD, TSS, and other crucial ones for your sector.
Step 7: Power and Electrical Requirements
Electricity will be needed by the ASP for aeration and other components. The size and efficiency of the system will determine the power requirements. For continuous operation, be sure to have a dependable power source and backup systems.
Step 8: Environmental and Safety Considerations:
To safeguard both employees and the environment, safety precautions should be put in place. Facilities for the treatment of industrial wastewater must follow proper containment and spill management measures.
Step 9: Funding and Budgeting
Costs are involved in designing, constructing, and maintaininga STP. Government grants, the manufacturing sector itself, or a mix of sources may provide funding. A thorough budget should be created, taking into account construction-related capital costs as well as ongoing operations and maintenance costs.
Step 10: Operation and Maintenance:
An STP must be regularly maintained and operated in order to work properly. The system should be monitored and maintained by qualified employees. Best practises must be followed when performing routine inspections, equipment servicing, and sludge removal.
Netsol Water is Greater Noida-based leading water & wastewater treatment plant manufacturer. We are industry's most demanding company based on client review and work quality. We are known as best commercial RO plant manufacturers, industrial RO plant manufacturer, sewage treatment plant manufacturer, Water Softener Plant Manufacturers and effluent treatment plant manufacturers. Apart from this 24x7 customer support is our USP. Call on +91-9650608473, or write us at enquiry@netsolwater.com for any support, inquiry or product-purchase related query.